Go to front page
  • Company
  • References
  • Offering
    • Advisory
    • Design & Testing
      • Ship Design
      • Propellers and Shaftline
      • Model Tests
      • Build Phase Support
      • Full scale testing
    • Operational Support
  • News, events and insights
    • Company news & articles
    • Industry publications
    • Events
  • Careers
  • Contact

  1. Home
  2. References
  3. SAIMAA – DETACHABLE ICEBREAKING BOW

SAIMAA – DETACHABLE ICEBREAKING BOW

Type of vessel:

Detachable bow

Type of work done:

Ice Model Tests, Shaft lines and propellers, ILMS, Full-scale testing

Customer:

Finnish Transport Agency

Builder:

Turku Repair Yard

Length x Breadth x Draught:

23.5 m x 12.6 m

Propulsion:

2 x 600 kW shaftlines

Year:

2018, 2021


A totally new concept of a detachable icebreaking bow, which is self-propelled and connected to a tugboat during the winter season, has been taken into use in Lake Saimaa, Finland’s largest freshwater lake, and the Saimaa Canal. The lake has a number of industries located on its wide shores and the canal connects the lake district with the Gulf of Finland. It is a vital transport channel for exports and imports of goods. The detachable bow brings more efficient icebreaking and ice management operations to the area.

The concept was developed by ILS Oy for the Finnish Transport Infrastructure Agency. Aker Arctic designed and delivered the two shaft lines and propellers for the bow, two bronze propellers for the tug and the Ice Load Monitoring System, which can be supervised remotely, as well as performing the ice model tests to verify the design before construction.

This bow will be pushed by the tug boat Calypso, which usually assists vessels in sea-ports in Southern Finland.

Saimaa bow
Saimaa and Calypso

Related articles

Detachable icebreaking bow for Lake Saimaa

Self-propelled detachable
icebreaking bow will be pushed by the tugboat , which usually assists Calypso
vessels in sea-ports in Southern Finland.

Read more

Icebreaking
bow Saimaa commissioned

Railotech designed and delivered the two shaft lines and propellers two bronze propellers for the pusher Calypso and the Ice Load Monitoring System (ILMS).

Read more

Full-scale trials of Calypso and Saimaa in late March 2021

The target was to test how the icebreaking bow-pusher combination works together, and to ensure that it fulfils its specified icebreaking requirements.

Read more

Related services


Design & Testing / Propellers and shaftline / Read more

Design & Testing / Model tests / Read more

Design & Testing / Build phase support / Read more

Design & Testing / Full scale testing / Read more


Go to front page

Merenkulkijankatu 6
00980 Helsinki, Finland

Tel: +358 10 323 6300
Email: info@railotech.fi

  • Company
  • References
  • Offering
  • News, events and insights
  • Careers
  • Contact
  • Privacy Policy
  • Compliance

© 2026 Railotech.